Buyer guides
How to source industrial robots from France: a step-by-step guide
By Robot Export teamPublished 3 min read
Why buyers look at France
According to IFR World Robotics 2026 data, France installed 4,500 industrial robots in 2025. That installed base is where local integrators gain their application experience.
This guide walks through the sourcing process step by step, whether you need a single welding cell, a fleet of mobile robots or a complete production line from France.
Step 1: Write the brief before you look for suppliers
Supplier proposals are only as good as the brief. Describe the process, not the robot you think you need.
- Application: welding, palletizing, machine tending, assembly, inspection or intralogistics
- Part or load: drawings, weight, dimensions, material and variants
- Throughput: target cycle time, shifts and expected uptime
- Site: floor space, utilities and the machines the cell must connect to
- Destination country, compliance marks required and who installs
- Budget range and target delivery date
Step 2: Decide whether you need a robot, a cell or a line
Some French suppliers build robots; many more are integrators who design cells around robot brands from several countries. Decide where your scope boundary sits. If you have your own integration team, you may only need equipment. If you want a working system in your plant, you need an integrator who takes responsibility for the whole cell, including fixtures, safety and controls.
Step 3: Build a shortlist of three to five suppliers
Screen for demonstrated experience with your application, not general capability statements. Ask for comparable references, the share of work that is exported and the destination markets they have delivered to. Confirm the workshop address and what is done in-house.
Step 4: Ask for proof that the application runs
Request video of a similar cell running or, better, a trial on your own sample parts. Agree in writing what the trial must show: cycle time, quality criteria and the number of consecutive good parts. For larger projects, a factory visit is worth the trip.
Step 5: Lock the commercial terms
Send every supplier the same specification and ask them to price equipment, engineering, freight, installation and training separately. Agree the Incoterms rule, currency, payment milestones, warranty and acceptance criteria before signing.
Step 6: Plan compliance and duties early
Equipment for the EU needs CE marking; equipment for the US and Canada must be designed for North American electrical and safety standards from day one. Check duties too: our guide to duties and trade agreements for robots from France covers the US and EU position.
Step 7: Factory acceptance, shipping and site acceptance
Run a factory acceptance test (FAT) in France against the agreed criteria before crating. Then plan export documents, freight, customs clearance, rigging, installation and a site acceptance test (SAT). Define training, spare parts and remote support in the contract.
Sources
Ready to start? Share your brief
Every sourcing project starts with a short brief: your application, volumes, destination and timeline. Send it and we'll come back with next steps.
Share your brief